THE STEEPLEHOUSE NARROW GAUGE RAILWAY
(25th AUGUST 2012) Includes a short video.

I had another visit to the High Peak Trail and also took in a visit to the Steeple House Railway. I arrived a good hour before opening time but was pleased to have an
invite bythe staff to join them in their shuntingduties up to the Carriage shed, which is built into a small quarry. Below are the photos  and video clip taken during the shunting moves.....

   
'Peter' Battery operated loco.                                                                                                      Start of walk up the quarry line to the carriage shed, which is at Dark Lane Quarry site.

  
Rear of loco shed with it's traverser.                                                                                                      'Peter' preceded us to the carriage shed.

   
A walk through the tunnel


Killer's (Middleton) quarry branch. Between Steeplehouse Jctn and Tunnel (Northwards). 1967. John Marshall. N.B. The line was to Standard Gauge.

   
A last at the carriage shed.


Plans are in hand to eetend the line up to Middleton quarry site. There appears to be plenty bf spare rail available.

    
A Dark Lane Quarry wagon.                                                                                                           At the three road carriage shed.

  2018BranchTowardsQuarryTerminalb.JPG 2013TheBranchTowardsQuarryTerminal.JPG
The track  going off to the end of the line. There is a small halt just up ahead, which is handy for the recreational grounds nearby.

   
Work starts to shunt and build up the two trains for the days' services.

   

 
Horwich joins in to assist in the shunting and to form it's own train.


Peter is joined by another battery electric locomotive.

   
Interesting point work sections.                                                                                                       Horwich awaits further shunt duties.

   
The vehicles are manually pushed up to the locomotives.                                                                An old quarry vehicle at the head shunt of Dark Lane quarry.


Rails, and almost the boggies and wagon are lost in the overgrowth.


The train is growing, in locomotives, at least.


A diese/petrol loco is now attached to the other two battery locos.


Riding on the completed train and passing an old box van as we arrive at the loco shed and station site.


'Greenbat'. Controls and opreating working instructions to the driver(s).

===================================================

Photos from the trips over the two quarry branch

After arrival back at the station end and having some refreshents from the small shop I enjoyed a trip over the two branches. First on the longer branch to Middleton,
with Horwich in charge then on the short branch with Peter at the head.


Level crossing at the access road to the quarry. The flagman goes to check that the road is clear and then gives the driver a green flag to cross the road
and go qietley  up to the stop block. This is the end of the line for the moment but there are plans to extend the line further into the quarry.

         
Dogs also enjoy the trip on the train.

   
Half way. Recreational Halt, as the name indicates leads to the grounds close by.

==================================================

Trip along the short quarry branch


Peter at the stop blocks at the quarry end.


Ditto


While high up in the Dales it is interesting to find fossiles in the stones that have been cut.


Iron sulphite seeps out of the rocks giving a red colour to the otherwise gray quarry stone.


Cut stone lays in piles. Not only showing the amount of work that took place here but of the terrible waste of workmanship in that these stones
have never been used for anything.


I find it sad that so much labour had gone into cutting these stones and for no worthwhile reason whatsoever.

My thanks to the railway staff who kindly invited me to join them during the shunting work. Their kindness really made my visit worthwhile.

===================================================================================================================

Video From 26th August 2012 Visit

Steeple House Railway web site

================================================

Back To Sheep Pasture To Middletom Bottom

=====================================================

Back to C&HPR Index

My Thanks To......

Whaley Bridge Photos for their kind permission to use old photos of the Whaley Bridge to Shallcross section. These and many old photos of Whaley Bridge can be viewd at:
http://www.subn.org/whaleybridgephotos/trains.php

John Evens (JodrelAviator) for the use of his xcelent colour photos of the C&HPR in the 60'd & 70's. John's Fickr photods are at: https://www.flickr.com/photos/the-evanses

John Neave for his kind permission to use a number of his 1960's photographs when the railway was still in operation. Check out John's ''Going Loco'', which includes a C&HPR history. At....
http://goingloco.neave.com/

Mark Norton for the use of 1940's photos by his late father Dennis J. D. Norton. http://www.photobydjnorton.com/CHPR_Menu.html#Links

To the son of Geoff Plum for the use of his late father's phots. Plumb Loco is at: Plumb Loco (By Geoff Plum) Photograhs

Reading: The Cromford & High Peak Railiway by John Marshall. Published by Martin Bairstow. Printed by The Amedeus Press 2011.

Other Railway Walks....

The Dundee & Newtyle Railway

The first passenger railway in Scotland opened in 1831, which had three inclines operated by stationary steam engines. The main source of income was from
the numerous stone quarries in the area and local farming produce. Passenger numbers were always sparse.
The inclines were abandoned in the mid 1800's by new deviations that allowed through locomotive running.
The line also included the Dundee Law (Hill) tunnel built at 300ft above the City. Both the north & south portals of the tunnel are buried below modern housing schemes.
Passenger services ended in 1955 and the line closed completely in the mid 60's under the Beeching Ax.

Unlike the C&HPR none of the Engine houses were preserved. The inclines can still be followed but sections have been back-filled or ploughed over
This web site tries to cover as much as possible.

Boddam To Ellon Branchline Built by the GNSR in the latter part of the 20th century. The passenger service only lasted until 1934 but goods remained up to total closure in 1949.
The GNSR built a large Golf course and Hotel at Cruden Bay, with an electric tramway between the station and hotel. All that remains today is the Golf course. One of the two elctric trams has been
fully renovated and is on show at the Grampian Transport Musem in Alford.

Other web pages....

Kittybrewster Memories  Kittybrewster Loco Depot, Aberdeen.

Tivoli Memories  The Tivoli Theatre, Aberdeen.

Hosted by www.theatreorgans.com

BACK TO HOME PAGE

 This page brought to you by:
VintageHammond.Com - We Buy-Sell-Trade Vintage Hammond Organs

This page brought to you by:
VintageHammond.Com - We Buy-Sell-Trade Vintage Hammond Organs

TheatreOrgans.com operates KEZL-FM Culbertson, NE A Non Profit Full Powered Radio Station